Services
Development of project documentation:
- general plan and transportation;
- architectural solutions;
- building solutions;
- engineering equipment and systems:
- cold and hot water- and gas supply;
- sewage system;
- heating;
- ventilation and air conditioning;
- electricity, electrical equipment, electric lighting;
- communications, radio and television;
- special sections:
- environment protection;
- engineering and technical activities;
- civil defense;
- measures of emergencies prevention;
- construction arrangement;
- protection of structures from corrosion;
- technological solutions (designing enterprises for various purposes).
Projects:
- industrial buildings and structures;
- agricultural buildings and structures;
- transport objects and their complexes;
- hydroengineering structures and their complexes;
- residential buildings and their complexes;
- public buildings and structures and their complexes;
- external heat-, water- and sewage networks;
- power lines, communications, radio and television;
- engineering constructions of industrial enterprises for various purposes;
- railways (spur tracks);
- streets and roads in towns and other settlements;
- networks, systems and structures of local telephone communication and radio broadcasting;
- establishment of automatic-telephone systems including linear structures;
- networks of receiving distribution systems of television and radio broadcasting;
- networks dispatch communication and telemetry;
- automatic fire and smoke protection systems.
Our Latest Projects
Year 2014
June 2014. — «Modernization of RUPTE «Orsha Linen Mill» with the expansion of production on Molodezhnaya street, 3 in Orsha.» II stage of modernization. Justification of investments.
May 2014. — Architectural and construction project for the unit: «Construction of chips production factory from raw potato JSC «Onega Plus» on the territory of Minsk district in the Kolodishchi village, Promyshlennaya str. Development of design and estimate documentation on a self-contained independent boiler room and gas supply of the processing equipment.»
May 2014. — Architectural and construction projects for the unit: «Reconstruction of the property complex on Mayakovsky street, 176 with release of stages» (development of individual sections of the building project on the production of the «Kamvol» block).
April 2014. — Architectural and construction projects for the unit: «Creating a new production of competitive business and economy classes fabrics under conditions of JSC «Kamvol». Development of design and estimate documentation for construction of an self-contained energy source.
April 2014. — Building project «Reconstruction of the plant with the installation of high-production line on production of flax fiber at «Orekhov flax factory».
April 2014. — Examination of construction facilities of canteen building No. 29 of JSC «MAPID» on Ponomarenko street, 35 in Minsk.
March 2014. — Reconstruction of JSC «Postavy flax factory» with the installation of high-production line of production of flax fiber in Postavy, Zavodskaya street 1. Boiler room.
February 2014. — Construction project for the unit: «Reconstruction of JSC «Slutsk flax factory» with the installation of high-production line on production of flax fiber». Stage 1 (Manufacturing building, filter chamber, overpass between them, outdoor processing facility for shove).
February 2014. — Building BOP renovation project of the unit «Modernization of RUPTE «Orsha Linen Mill» with the expansion of production on Molodezhnaya street, 3 in Orsha». 1st phase, launch complex 7b (installation and modernization of drying-stretching machines, installation of the measuring-rejecting machines).
January 2014. — Architectural and construction projects for the unit: «Creating a new production of competitive business and economy classes fabrics under conditions of JSC «Kamvol». Development of design and estimate documentation for construction of self-contained energy source.
January 2014. — Reconstruction of JSC «Slutsk flax factory» with the installation of high-production line on production of flax fiber. Construction dewatering. Stage 2-2. Manufacturing building with annex, filter chamber.
Year 2013
December 2013. — Construction project for the unit: «Construction of administrative building on Lynkov street in Minsk».
December 2013. — Examination of construction facilities of shove plates workshop for the unit: «Reconstruction of JSC «Slutsk flax factory» with the installation of high-production line on production of flax fiber.
November 2013. — Building project «Reconstruction of the plant with the installation of high-production line on production of flax fiber at JSC «Orekhov flax factory».
November 2013. — Architectural and construction projects amending the design and estimate documentation of the unit «Administrative economic block, centre of cars and construction machinery service, near Krasnaya Sloboda street in Minsk. «Customer JSC «Minsk specialized office No. 217».
September 2013. — Construction project «Installation of high-production process line of short fiber at JSC «Dvoreckij flax factory» in Dyatlovo district».
August 2013. — Construction of backup artesian well for water supply of the unit «Reconstruction of JSC «Korelichi-Len» with placement of high-production line of long and short fiber».
August 2013. — Construction project «Reconstruction of JSC «Postavy flax factory» with installation of high-production line of production of flax fiber in Postavy, Zavodskaya street, 1″.
August 2013. — Architectural and construction projects for the object: «Reconstruction of the property complex on Mayakovsky street, 176, with the release of stages» (development of individual sections of the building project on the production block of JSC «Kamvol»). Customer: Unitary Enterprise «BELPROMPROJECT», Design Institute.
August 2013. — Stage «Justification of investment» of the unit «Reconstruction of the plant with installation of high-production line on production of flax fiber at JSC “Liahovichi flax factory».
July 2013. — Building renovation project of the factory No. 3 with annexes of the unit: «Modernization of RUPTE «Orsha Linen Mill» with the expansion of production on Molodezhnaya street, 3 in Orsha”. 1st phase, 3d launch complex.
July 2013. — Construction project for the unit: «Construction of administrative building on Lynkovv in Minsk».
May 2013. — Reconstruction of manufacture in the branch «Korma flax factory» of JSC «Gomellen». Second phase of construction. Boiler room.
May 2013. — Additional work on the construction project «Reconstruction of building with specialized health-care purpose (mortuary) on Kizhevatova street, 58».
May 2013. — Measurements and examination of constructions of two buildings for the unit: «Reconstruction of JSC «Postavy flax factory» with installation of high-production line on production of flax fiber in Postavy, Zavodskaya street, 1.
April 2013. — Reconstruction of manufacture in branch «Korma flax factory» of JSC «Gomellen» (measurements and examination of constructions of the boiler room and manufacturing block).
March 2013. — Construction project «Reconstruction of JSC «Korelichi-Len» with placement of high-production line of long and short fiber».
March 2013. — Justification of investment of the unit «Reconstruction of JSC «Postavy flax factory” with installation of high-production line of production of flax fiber in Postavy, Zavodskaya street, 1».
February 2013. — A construction project for reconstruction of the plant № 3 with extensions project: «Modernization of RUPTE «Orsha Linen Mill» with the expansion of its production in 3, Molodyozhnaya street, in Orsha.
January 2013. — Construction of a mini heat station at «Slutsk cheese plant» JSC in Slutsk.
Year 2012
December 2012. — Facility for mechanical sorting of waste in the city of Grodno. Customer: Eptisa Servicios de Ingeniria S. L.
December 2012. – An architectural project of the object: «Reconstruction of the plant with the installation of high-performance lines for development of flax fiber «Orekhovsk flax plant» JSC.
December 2012. — Development of industry standards of artificial light textile, hosiery and shoe industries. Customer: «Bellegprom».
November 2012. – An architectural project: «Reconstruction of the branch of «Slutsk flax plant» JSC of «Volozhin flax plant» and installation of high-capacity line of flax processing». First phase of construction.
October 2012. — An architectural project of construction of chemicals storage facility «Modernization of RUPTE «Orsha Linen Mill» with the expansion of its production in 3, Molodyozhnaya street, in Orsha.
October 2012. — An architectural project of construction of repair and building shop (RBS) of the object «Modernization of RUPTE «Orsha Linen Mill» with the expansion of its production in 3, Molodyozhnaya street, in Orsha.
September 2012. — Measurements and testing of building constructions for the project: Reconstruction of the plant with the installation of a high-capacity line of flax processing at «Orekhovsk flax plant».
August 2012. — Inspection of building structures of the surface of the conference hall at the healthcare establishment of the «10th city clinical hospital», Minsk.
August 2012. – A construction project: «Reconstruction of incomplete construction of cooling station for the object: «Transformation of the boiler house into a mini heat station in 11 Gagarina street, Vitebsk». Development of HVAC of sewing shops No. 1,2,3,4″.
July 2012. — Reconstruction of the main building No. 1 in 62, S. Kovalevskoi lane for location of television production in Minsk. Conveyor No. 3. surface mount line and test center. Electric lighting and connection of electrical equipment.
June 2012. — «Complex of catering «LIDO» type with administrative and social infrastructure, etc. in 65, Pobeditelei avenue in Minsk.» Adjustment of individual sections of the project (water supply- and sewage systems, electric power supply system) in response to changes in the instructions for technologists.
June 2012. — Renovation and expansion of production of dried whole milk by «Kletskaya Krynachka» JSC. III stage. Industrial boiler house with the capacity of 20 tons of steam per hour».
May 2012. — Modernisation of premises on floors 10,11,12 for an embassy in the office building in 11, Z.Byaduli street, in Minsk.
May 2012. — Development of design estimates for the project «Residential 60-apartment house No.8.3 in the residential settlement of «Solnechny» in Minsk district according to the general plan». First Stage – An architectural project (stage A) with a sketch solution.
May 2012. — Development of construction documents for the project «Residential 96-apartment house No. 8.5 according to the general plan in a residential settlement of «Solnechny» in Minsk district». First Stage – An architectural project (stage A) with a sketch solution.
May 2012. — An architectural project «Reconstruction of production in the branch of «Korma flax plant» Gomellyon JSC». First phase of construction.
April 2012. — Two-stage project «Reconstruction of the primary production with the installation import line for manufacture of long flax fiber in «Shklov flax plant» JSC.
March 2012. – An architectural project of reconstruction of plant No. 3 with adjacent accommodations to the object: «Modernization of RUPTE «Orsha Linen Mill» with the expansion of its production in 3, Molodyozhnaya street, in Orsha.
January 2012. – Construction project of renovation of first lift pumping station in Tekstilschikov park of the object «Modernization of RUPTE «Orsha Linen Mill» with the expansion of its production in 3, Molodyozhnaya street, in Orsha.
Year 2011
December 2011. — Justification of investment of the object «Modernization of RUPTE «Orsha Linen Mill» with the expansion of its production in 3, Molodyozhnaya street, in Orsha.
November 2011. — Examination of the system of electrical appliance in the enterprises of light industry in order to improve the reliability of power supply and calculation of electrical loads. Development of sectoral standards of artificial lighting of tailoring industry in conditions of the modern industrial production. Customer: «Bellegprom».
September 2011. – A construction project «Implementation of co-generation equipment based on direct-drive gas turbogenerators with the total capacity of 500 kW in the boiler house of «Glubokoye milk canning plant».
August 2011. – A construction project «Installation of tumbling machine «AIRO» in the production of decoration materials at «Belfa» JSC in Zhlobin».
June 2011. — An architectural project «Reconstruction of the main building No. 1 in 62, S. Kovalevskoi lane for location of television production in Minsk».
May 2011. — «Complex of catering of «LIDO» type with administrative and social infrastructure, etc. in 65, Pobeditelei avenue in Minsk». Development of individual sections of the project.
May 2011. — Development of the project: «Reconstruction torsion weaving facility in 87, Grishina street of «Mogotex» JSC.
March 2011. — A construction project. «Reconstruction of the electrodeposit shop of building No. 4 in 61, Pobeditelei avenue for arrangement of the a site for service and repair of household appliances of «Atlant » CJSC.
January 2011. – An architectural project: «Residential building. II phase of construction of the settlement «Solnechny» in Minsk district «(external networks).
Year 2010
December 2010. — Measurements and examination of industrial building No. 1 and office and service building for organization of construction «Reconstruction of the production building No. 1 in 62 S. Kovalevskaya, lane for location television production in Minsk».
November 2010. — A construction project «Transforming a boiler house into a mini heat station». Customer: «ZNAMYA INDUSTRIALIZATSII» Open Joint Stock Company.
October 2010. — Measurements and a general survey of structures of buildings of the project: «Reconstruction of the primary production with the installation of import line for developing long flax fiber at «Shklov flax plant» JSC.
September 2010. – A construction project «Enterprise for milk production for 1000 head of cattle in the village of Staroselye of Belynichi district of Mogilev region».
September 2010. — Measurements and general inspection of buildings of factory No. 2 of Orsha flax processing factory in 3, Molodyozhnaya street, in Orsha.
August 2010. – A construction project «Reconstruction of the commercial dairy farm for breeding 1500 heads of young animals in the settlement of B. Krushinovka in Rogachev district».
July 2010. — Construction of an office building in Lynkova street in Minsk.
June 2010. – An architectural and construction project «Installation of 3 block modules with gas reciprocating units with the capacity of 1 MW each in 30, Intuziastov street, in Baranovichi».
June 2010. — Reconstruction of boiler house of «Ivenets art pottery factory» JSC in the borough of Ivenets, in Minsk region.
May 2010. — A construction project «Co-generation direct-drive turbogenerator installation with the total capacity of not less than 450kW in «Dzerzhinski » agricomplex» in a poultry farm specializing in keeping parental forms of broilers in the village of Zabolotye, in Dzerzhinsk district».
May 2010. — A construction project «Construction of cable manufacture plant in Soyedinitelnaya Magistral street in Minsk».
April 2010. — A construction project «Implementation of the steam turbine generator installation in the boiler house «Mira», in 13a, Mira street, in Vitebsk».
March 2010. — A construction project. Reconstruction of incomplete construction stockbreeding complex as a production base in the village of Syomkovo, in Minsk region.
Year 2009
December 2009. — A construction project «Reconstruction of specialized health-care and sanitary building (mortuary) in 58, Kizhevatova street». Customer: public service of medical forensic examination.
November 2009. — A construction project. Fuel-supply station of «Dvorets flax plant» in Dyatlovo district, in Grodno region.
October 2009. — Reconstruction of greenhouses «Flowers of the capital» Communal Unitary Enterprise and construction of a gas boiler house in 37 Montazhnikov street in Minsk.
April 2009. — Measurements and examination of building structures and the main and academic building of the 10th city hospital in 73, Uborevicha street, in Minsk. (Heat recovery). The main building, block No. 4.
March 2009. — Overhaul of the office and service building of «Dubrovno flax plant» JSC in 1, Zavodskoi lane, in Dubrovno, in Vitebsk region.
February, 2009. — A construction project «Production and warehouse facility with an office and service building in Dzerzhinskaya street, in Zaslavl «(Development of individual sections of the project).
January 2009. — Measurements and examination of structures of the building of «Minsk» dance hall in Chelyuskintsev park, in Minsk.
Year 2008
December 2008. — Measurements and examination of building structures of office and residential buildings in 70, Pushkin avenue, and on 205 , Rosa Luxemburg street, in Minsk.
December 2008. — A construction project. «Replacement of boilers using local kinds of fuel (flax boon) for boilers with higher efficiency» for «Verkhnedvinsk flax plant» JSC in Verhnedvinsk, in Vitebsk region.
October 2008. — Commissioning of the cogeneration plant of 1 MW in the boiler house at the CUPE «Brest boiler enterprise».
October 2008. — Modernization of the building of the assembly shop of «Smart Machinery» IE in19, Zamkovaya street, in Molodechno.
September 2008. — Reconstruction of the production areas and the cooling station for manufacturing facilities for production of household appliances. The system of heat- and electric power supply with the use of gas engine plant at JSC «Horizont» in 62, S. Kovalevskoi lane, in Minsk.
August 2008. — Office building with public and services premises at «UNIS OIL» FLLC in 13, Z. Byaduli, in Minsk.
July 2008. — Plant for processing and toughening glass «Yenisei» PUE in Dzerzhinskaya street, in Zaslavl.
April 2008. — Workshop for production of semi-dry food «Onega» PALC.
March 2008. — Reconstruction of «Dvorets flax plant» JSC with the construction of a new production building for placement of a Belgian line of fiber manufacture.
January 2008. — Commissioning of a co-generation installation based on gas reciprocating unit with capacity of 1 MW in «Bereza cheese plant» JSC.
Year 2007
July 2007. — Overhaul of the office and service building of «Dubrovno flax plant» and installation of a Belgian line of fiber manufacture «Van Dommele Engineering NV» in Dubrovno, in Vitebsk region.
May 2007. — A complex for breeding 1,500 head of heifers in «Klenovichi» JSC in the borough of Bobr, in Krupki district.







